유한요소해석을 통한 중량물 이동대차 시저스붐의 구조 및 강도 해석
* 본 문서는 배포용으로 복사 및 편집이 불가합니다.
서지정보
ㆍ발행기관 : 한국산업경영시스템학회
ㆍ수록지정보 : 산업경영시스템학회지 / 46권 / 4호
ㆍ저자명 : 임현호, 양창민, 최권웅, 최대우
ㆍ저자명 : 임현호, 양창민, 최권웅, 최대우
목차
1. 서 론2. 기존 이동대차 유한요소해석 연구
3. 모델링 및 유한요소해석 조건
4. Link 구조해석 결과
4.1 Lift Link Inner
4.2 Lift Link Outer
5. 포지션에 따른 구조해석
5.1 포지션에 따른 구조해석 조건
5.2 포지션에 따른 구조해석 결과
6. 결 론
Acknowledgement
영어 초록
Special equipment used for snow removal is only used in the winter and must be moved into storage during non-winter seasons. However, when moving heavy equipment using a forklift within a limited space, safety accidents may occur due to deformation and damage due to the worker's limited visibility and excessive loading of heavy objects. In this study, the scissors boom of the developed heavy load transporter was conducted in two cases: link structural analysis and position-based structural analysis. In detail, the link structural analysis covers four cases of stress and safety factor according to material and thickness to optimize the specifications of the material selected during development, and the structural analysis according to position covers two cases before and after the lift, when maximum stress concentration is achieved. Safety was evaluated through finite element analysis. As a result of the study, when manufacturing a scissors boom type heavy load transporter that can withstand a load of 10 tons, the link showed safety at SS400 4.5mm or higher, and reinforcement is needed in the upper and lower structures, so it is judged to be useful in applying materials according to the load.참고 자료
없음"산업경영시스템학회지"의 다른 논문
An Analysis on the Effect of PBL(Performance Based Logi..8페이지
A Study on the Loss Cost of Delayed Weaponization of We..10페이지
Performance Analysis of MixMatch-Based Semi-Supervised ..9페이지
A Study on the Organization and Procedures for Acquirin..8페이지
A War-time Engineering Equipment’s Assignment and Opera..10페이지
Optimal Hierarchical Design Methodology for AESA Radar ..13페이지
Net Assessment-Based Study to Determine the Optimal Siz..9페이지
Reallocation of Force in the Lanchester (3,3) Combat Mo..9페이지
Exploring trends in U.N. Peacekeeping Activities in Kor..17페이지
Location-Routing Problem for Reconnaissance Surveillanc..8페이지