[소프트웨어 개발론] UCP와 패턴분석을 통합한 소프트웨어 비용 예측
- 최초 등록일
- 2005.07.20
- 최종 저작일
- 2005.06
- 7페이지/ MS 워드
- 가격 1,000원
목차
1. 개요 ABSTACT
2. 소개 Introduction
3. 관련 연구 Related Work
4. 접근 방법 Approach
5. 통합 Combine Two Methods
6. 재사용성 Reusability
7. 토론 Discussion
8. 결론 Conclusion
9. 발전 방향 Future Work
본문내용
We will combine the use case point method and the pattern analogies method to produce a new stronger estimation method. To do this, we should know about the advantages of both methods. By understanding the merits and the demerits of these methods, we can make a new method which adopts their strength and avoids their weakness.
The advantage to estimating with use case points is that the process can be automated. If Use Case document structured properly for a company, we can use automation tools. But, the use case point does not related to the lines of code. LOC is a traditional measure which is widely used in many methods. So if get LOC, we can apply this value to a lot of estimation methods.
The advantage of the pattern analogy is easy to use, because the values which will be used for the estimation are already built, so we just apply these values to estimate the software. But the pattern analogy may make the weak results when the project experiments are not enough to get the proper value for each parameter.
참고 자료
[1] Use Case Points - Resource Estimation for Objectory Projects, Gustav Karner, Objective Systems SF AB (copyright owned by Rational Software), 1993
[2] Software Estimation Using Pattern Analogies, Hugo Troche, 2004
[3] Design Patterns, Gamma, Erich; Helm, Richard; Johnson, Ralph; Vlissides, John.. Boston: Addison-Wesley, 1995.
[4] Measurement for software process improvement. C-FP-003 Issue 1 draft B, Barbara Kitchenham, 1995.